Assignment name & Brief Description of main deliverable/Outputs |
---|
Traffic Assessment studies for 6 laning of Chandikhol-Paradip Section of NH 5 in Orissa. |
Financial analysis and Traffic survey of Mathura- Jaipur in the State of Rajasthan on NH No.11 from chainage 120-228, and Meerut- Muzaffarnagar Section in the State of Uttar Pradesh on NH No. 58 from chainage 52 to 131 on BOT basis |
Traffic and analysis for 6 Lane Eastern Peripheral Expressway (NH NO.NE-II) in the state of Haryana and Uttar Pradesh: Package V from 93km to 114 km on EPC mode |
Pre Tender detailed Traffic study analysis for Four laning of Zirakpur- Patiala section of NH-64 from km 0.0 to km 50.00 in the state of Punjab through Public Private Partnership of DBFOT basis. |
Consultancy service for pre tender servicer for Estimating toll traffic and revenue of Six laning of Ahmedabad to Vadodara section of NH 8 from km 6.4 to km 108.7 (length 102.3 km) in the state of Gujarat and Improvement of Ahmadabad – Vadodara expressway from km 0.0 to km 93.302 in the state of Gujarat( length 93.302 km) under NHDP Phase V on Design Build Finance Operate Transfer (DBFOT) toll basis |
Revalidation of traffic study for four laning of Manor – Vada – Bhiwandi section of SH 24 and SH 25 in the State of Maharashtra |
Traffic assessment report for 6 laning of Panagarh – Barwa Adda, section of NH-2 in West Bengal/Jharkhand. |
Traffic Survey Consultancy services in respect of the proposed Six Laning of Etawah – Chakeri (Kanpur) section of NH-2 from Km 323.475 to Km 483.687 (Total Length – 160 Km) (the Project) through PPP on design, build, finance, operate and transfer pattern in the state of Uttar Pradesh for OSEPL on exclusive basis |
Consultancy Service for Construction and development of Jhabua – Jobat – Zeerapanya – Bag – Kukshi road on BOT basis |
Traffic assessment study for 6 laning of Chandikhol – Paradip Section of NH-5A in Orissa |
Technical Consultancy For two Projects of national Highway authority of India to be Executed as OMT Project |
Traffic and Transportation Study for GIFT Project |
Post bid Traffic Study for NH2 from Agra to Etawah |
Traffic and Transportation consultancy services for Lenders Due Diligence for Four Laning of Kaithal-Rajasthan border section of NH-65 from KM -0.500 to Km 165.759 |
Traffic study for estimation of Toll Traffic and Revenue on Various BOT Project
|
Traffic Studies for Solapur Maharashtra border section of NH -9 |
Traffic Studies for NH-7 from Jabalpur – Rewa |
Traffic analysis of “Amritsar Personalized Rapid Transit System (PRT)Project” in State of Punjab |
Traffic Studies for NH-3 from Gwalior to Dewas via Shivpuri |
Independent Traffic Studies for NH-8 and NE-1 (Ahmadabad -Vadodara) |
Consultancy Services for Pre-Feasibility Study of High Speed Rail Corridor between Howrah-Haldia. To prepare Pre-feasibility Report on introduction of inter-city High Speed Passenger Railway having operational speed of 300 kmph and all fixed structures to be planned for a design speed of 350 kmph connecting Howrah-Haldia
Service Rendered
|
Post tender consultancy services for assessment of traffic characteristics to assist the concessionaire in value engineering.
|
CITY ROAD IMPROVEMENT PROJECT (CRIP) IN KOLLAM CITY
Services Rendered
|
Comprehensive Transportation Study for Hyderabad Metropolitan Area Carry out comprehensive traffic and transportation study for Hyderabad Metropolitan region to develop an integrated urban development and mobility strategy Services Rendered
|
Preparation of Development Plans for Ratlam – Nagda Investment Region (In Madhya Pradesh Sub Region of Delhi Mumbai Industrial Corridor)
Services Rendered
|
Pre-bid Traffic Studies for NH-3 from Gwalior to Dewas via Shivpuri |
Construction Supervision for the Project “Four Laning of Yedeshi – Aurangabad Section of NH-211 from km 100.000 to km 290.00 in the State of Maharastra to be executed as BOT(toll) on DBFOT Pattern under NHDP Phase – IV B |
Traffic Studies for Updation of Detailed Project Report for 4 Laning of Barasat – Krishnagar section of NH-34 from KM 31.00 to KM 115.00 in the district of North 24 Parganaa and Nadia in the State of West Bengal |
Assessment report for 6 laning of Bhubaneswar – Chandikhol section of NH-5 in Orissa |
Carrying out study and preparation of Regional Mobility Plan for Greater Raipur Region
Service Rendered
|
Assignment name & Brief Description of main deliverables/Outputs |
---|
Assisting Gangtok Municipal Corporation to participate in Smart City Mission of Ministry of Urban Development, Government of India
Description of actual services provided in the assignment:
|
Preparation of City street vending Plan for Bulandsahar, Uttar Pradesh under support for Urban street Vendors
Project Description
|
Assisting Lucknow Municipal Corporation to participate in Smart City Mission of Ministry of Urban Development, Government of India. (Round-1)
Project Description:
|
Assisting Lucknow Municipal Corporation to participate in Smart City Mission of Ministry of Urban Development, Government of India. (Fast Track Round)
Project Description:
|
Assisting Namchi Municipal Council to participate in Smart City Mission of Ministry of Urban Development, Government of India. (Round -1)
|
Assisting Namchi Municipal Council to participate in Smart City Mission of Ministry of Urban Development, Government of India. (Fast Track Round)
|
Integrated City Development Plan Samba, Jammu and Kashmir
Project Description:
|
Assignment name & Brief Description of main deliverables/Outputs |
---|
Improvement of Property tax in Varanasi Nagar Nigam
Project Description:
|
Improvement in Advertisement Tax in Karimnagar
Project Description
|
Improvement of Property tax in Lucknow Municipal Corporation
Project Description:
|
Improvement in Advertisement Tax in Lucknow Municipal Corporation
Project Description:
|
Property tax reform to Unit Area Method (UAM) under the Loan 2142: IND Assam Governance & Public Resource Management Sector Development Project.
Description of actual services provided in the assignment:
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) – Nagpur, Maharashtra
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) Chhindwara, Madhya Pradesh
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) Dehradun, Uttarakhand
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) Haridwar, Uttarakhand
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) – Puri, Odisha
|
Improvement in Property Tax Collection, Widening of Tax Base, Computerization of Property Tax Records, Introduction of Online Assessment and Collection, Dispute Redress Mechanism in Selected 6 Cities (World Bank Funded) – Cuttack, Odisha
|
Database creation of all properties and allocating Unique property Identification Code with the aim to streamline tax collection, Delhi
|
Urban Renewal Project- Imphal CBD
The project was undertaken to plan and design urban renewal in Imphal CBD area through design, management and revenue enhancement strategies. |
Consultancy services for preparation of development plan for Pithampur – Dhar – Mhow investment region Madhya Pradesh sub-region of DMIC The project has been undertaken for development of Investment region of Pithampur – Dhar – Mhow under the DMIC development plan in the Madhya Pradesh sub-region. |
Improvement in Property Tax Collection – Widening of Tax base – Computerization of property tax records – Introduction of online assessment and collection – Dispute Redress mechanism in 6 selected cities (Nagpur, Chhindwara, Odhisha, Dehradun, Haridwar and Puri)
|